"Raytheon would like to thank Charter Environmental for the excellent work
on our Burlington Site. Everyone who we had contact with was extremely
professional and responsive to our needs. The job was completed within
budget and ahead of schedule. We deeply appreciate your commitment to
helping get this job done."
|
|
Sr. Environmental Engineer
Raytheon Company
Spencer Laboratories Hazardous Materials Abatement and Building Demolition Project
Project Value: $3,568,405 |
|
"I didn't think any firm (large or small) could complete this project within the proposed schedule. However, Charter completed the work 4 months ahead of schedule, which was an amazing feat.
I would highly recommend Charter for other construction/restoration work."
|
|
Moe Beaudoin, P.E.
US Army Corps of Engineers
Lonsdale Marsh Drive-In Project
Project Value: $2,270,269 |
|
"Charter's responsiveness and flexibility allowed this project to continue without interruption and ensured the project schedule would not be impacted. Moreover, Charter was able to accommodate
increased waste volumes (100,000 to 200,000 tons) without missing a beat. I wouldn't hesitate to recommend Charter for future work. The project generated more soil than originally anticipated. Charter worked with Tishman
to develop cost saving operations for processing the soil so that it could be reused as backfill. This saved the project over $1,000,000."
|
|
Program Manager
Tishman Corporation
Boston Convention Center Project
Project Value: $5,880,000 |
|
“Charter's quality of workmanship was outstanding. Charter was able to provide a quality job with no cost or time increases. Unforeseen conditions with respect to asbestos abatement and utilities were encountered. Charter was able to adjust to these conditions without impacting the schedule. Charter was responsive and cooperative throughout the project. Their on-site personnel were experienced, knowledgeable and conscientious.”
|
|
Project Engineer
Public Works New London
Groton Building 138 Abatement and Demolition
Project Value: $388,667 |
|
"This was a difficult and dynamic project that required much 'on the fly' performance due to many changed conditions. Charter remained unfazed during this process and responded favorably,
always within strict time constraints. They planned ahead on many occasions so that unforeseen changes would not result in scheduling conflicts.. The whole construction team was very impressed with Charter's ability
to manage multiple waste streams, changing conditions and the overall massive size and scope of their responsibilities to the project."
|
|
Vice President
James. W. Flett Company
Kendall Square Soil Excavation Project
Project Value: $15,200,000 |